Administrative Approvals
|
Number of Approvals so far: 25
|
Amount Approved so far: 45749.6 Lakhs
|
|
|
|
Pre 2007-08 Releases
|
Number of Releases so far: 4
|
Amount Released so far: 360 Lakhs
|
|
|
|
Post 2007-08 Sanctions
|
Number of Post 2007-08 Sanctions so far: 72
|
Total Post 2007-08 Sanctioned Amount for Func.Head 3601051010200 & Obj.Head 31 : 2986.25 Lakhs
|
Total Post 2007-08 Sanctioned Amount for Func.Head 3601051010200 & Obj.Head 35 : 9769.89 Lakhs
|
|
|
|
Post 2007-08 Releases
|
Number of Post 2007-08 Releases so far: 72
|
Total Post 2007-08 Released Amount for Func.Head 3601051010200 & Obj.Head 31 : 2986.25 Lakhs
|
Total Post 2007-08 Released Amount for Func.Head 3601051010200 & Obj.Head 35 : 9769.89 Lakhs
|
|
|
|
Projects Involved
|
Number of projects so far: 25
|
1 Upgradation & Remodelling of Existing Distribution System of MG Road and its surrounding areas, Gangtok, Sikkim.
|
2 Extension of one 66 KV Bay at 66/11 KV Switchyard at Gyalshing and construction of 66/11 KV, 1x5 MVA Substation at Sardung (Yangthang) in West Sikkim
|
3 Interconnection of 11 KV Development Area Sub-Station with 11/11 KV TNA Sub-Station as part of Ring Main Network, Gangtok
|
4 Design, Supply, Erection, Testing, Commission of 2x3.5 MVA, 3.3/66 KV Switchyard cum Substation at Rongli HEP together with Construction of one 66 KV Line Bay from Rongli HEP
|
5 Upgradation & Conversion of Existing dedicated 3.3 KV System into 11 KV System of Gangtok, Sikkim
|
6 Remodelling & Augmentation of HT & LT Power supply & Distribution System at Pakyong Bazar in East Sikkim.
|
7 Conversion of existing 11 KV Transmission line and 440V, L.T Distribution overhead lines including service connections to under ground cable system in congested areas at Pelling in West Sikkim.
|
8 Conversion of Overhead HT & LT Overhead Lines into underground cable system with up-gradation of the existing distribution system at Ambedkar Road, Munshi colony, Bhojo Gharie & Sonam Gyatso Marg & Arithang Areas, Gangtok, Sikkim
|
9 Remodeling & Conversion of existing Overhead LT line into Underground cable system of all Electrical Network in and around Rabong, South Sikkim
|
10 Design, Supply,Erection,Testing, Commissioning of 66KV Single Circuit trans.line from 3.3/66KV Sub.Stn. of Rongli-I HEP at Sisney inc.extension of line bay at 66/11KV sub.stn.at Sungdung,Chujachen,Rongli East Sikkim
|
11 Upgradation of the Distribution System including inst of new substations at strategic locations and strengthening of Ring Main, Gangtok
|
12 Synchronisation of Rimbi Stage-I, Rimbi Stage-II and KKHEP(DENTAM) with the 66KV State Grid inc. renovation & modernization of Rimbi Stage-I, Stage-II and KKHEP(Phase-II)
|
13 Diversion of 66KV Transmission Line from Tadong Sub-Station to ICAR compound in D/C 66 KV Tower for independent circuit for Phodong, North Sikkim
|
14 Renovation,Improvement & Strengthening of 66KV switch yard & Construction of 1X7.5MVA 66/11KV substation at Lower Lagyap Hydel Project, Ranipool, Sikkim
|
15 Upgradation, Strengthening of HL/LT Distribution System including Installation of New Substations at strategic locations of Deorali(Pani House Area) and Upper Syari Gangtok, Sikkim
|
16 10 Nos.MHPs in Sikkim
|
17 Electrification of Central Park along with Conversion of Existing Overhead L.T. Line into Underground Cable with System Improvement & Street Light and Around Namchi Bazar in SOuth Sikkim
|
18 Upgradation and Strengthening of HT and LT Lines and Substations at Helipad Area, Bakthang and adjoining places in East Sikkim
|
19 Construction of 11KV 3 Phase heavy duty transmission line from Rabong to Borong via Deorali and Construction of COntrol room at Ralong _ Construction of 3 phase 11KV Heavy Duty Transmission line from Rabong to Nambong via Zarong, Sikkim
|
20 Construction of 66kV S/c Transmission Line from 132/66kV Switchyard at Ravangla to Central University with 66/11kV, 2x5 MVA substation at Yangang, South Sikkim
|
21 Procurement, erection, testing and commissioning of 20 MVA 132/66 KV power transformer for 132/66 KV Sub-tation at Kyongsa, Gyalshing, West Sikkim i/c electrification of the Chenrezig Shingkham Riwa Potala at Sangha Choeling, Pelling in West Sikkim
|
22 Construction of 11/11 KV switching sub-station including re-arrangement and drawing of 11 KV transmission line at Kongri alongwith modernization of Tashiding Bazar in West Sikkim, Sikkim
|
23 System Improvement and modernization i/c Augmentation of Distribution system of Uttarey Bazaar, Dentam Bazaar in West Sikkim
|
24 Integration of new sub-stations _ generation stations under North District with existing Central Load Despatch Centre with facility for Energy Auditing
|
25 Strengthening, modernization and improvement of transmission and distribution system of Raj Bhawan, Mintokgang, High court, VIP area and surrounding areas in Gangtok, East Sikkim
|
|
|